| |
The Wetlands
Restoration Project
Click on the links below to
access videos which show the actual work being carried out. These streaming
videos will play automatically after a pause of about 30 seconds. Please ensure that your
speakers are turned on! (Windows Media Player Version 7
or better required). To access a detailed project report which includes Civil
Engineers' Drawings and botanical surveys click here. |
INTRODUCTION |
Introducing the Woodland Education Centre, its history
and the rhododenron clearance. |
Kingfisher Pond |
The excavation of Kingfisher pond as well as gabion
basket construction, pipe laying and concreting. |
The Lake |
The excavation of the lake using two swing shovels. |
Access |
Creating the access tracks. |
Conclusions |
The finished project including the Marsh
and Wetland. The benefits to wildlife and the
public. |
 |
To access these videos you must have Windows
Media Player Version 7 or greater. To check which version you have, open Windows Media
Player. Now go to the Help menu and select 'About Windows Media Player'. The version will
be displayed. FREE!
You can get the latest version of Windows Media Player from Microsoft by clicking here. |
|