The two old hedgebanks on the project site (Plan) have been repaired and rebuilt (Plate 7). At the
same time, an area adjacent to the hedgebank in the centre of the project site, was deeply
cultivated by the digger. This area has been delineated by green posts (Plate 8).
This will be separately sampled in future surveys to see what effect, if any, this has on
regeneration. |